Fixed price vs time and material: choosing a contract model for software

Fixed price vs time and material comes down to one question: can you write down today what you are buying? If you can, a fixed price split into milestones gives you a known cost and puts the delivery risk on the developer. If you cannot, time and material bills the hours actually worked and leaves the risk with you. This guide compares both, explains change requests under each, and shows when a hybrid fits.

Fixed price suits
A scope you can write down
Time and material suits
Work you cannot yet define
Codebrix model
Fixed price per milestone
Pricing
On a call within an hour

Updated · By the Codebrix team

Fixed price vs time and material at a glance

Both models can produce good software. They differ in what is agreed before work starts, how the invoice is calculated and who pays when the work takes longer than planned. Read the table row by row and mark which column sounds more like your project.

The two contract models side by side
FactorFixed priceTime and material
What you agree firstA written scope, milestones, acceptance criteria and a price for each milestoneA rate card, the people involved and how hours are reported
How the invoice is worked outThe agreed amount, due when a milestone is delivered and acceptedHours or days logged in the period multiplied by the agreed rates
Who carries an overrunThe developer, for anything inside the written scopeYou, because every extra hour is billed
Budget certaintyHigh, as long as the scope holdsLow unless you set a cap
Changing direction mid-buildPossible through a written change requestEasy: you reprioritise the next week's work
Your time neededHeavy at the start to settle scope, then weekly reviewsSteady throughout, because you set priorities as you go
The usual failureA vague scope that turns every question into a disputeHours that keep growing with no clear finish line

Neither column is the cheaper one by nature. A fixed price includes the developer's allowance for unknowns; time and material passes the unknowns to you at cost. Which costs less depends on how many unknowns there really are.

How a fixed price contract works in practice

A fixed price only protects you if the scope behind it is specific. The sequence below is what a sound fixed price engagement looks like from the buyer's side.

  1. You describe the project in writing: who uses it, what each user must be able to do, and which systems it connects to.
  2. The developer turns that into a scope with an explicit list of what is out, not only what is in.
  3. The scope is cut into milestones, each with a deliverable you can test and a price.
  4. Each milestone has acceptance criteria: what you will check, where, and what counts as a pass.
  5. You pay a milestone when it is delivered and accepted, so you never pay far ahead of working software.

Where fixed price goes wrong

  • Scope written as adjectives. 'A modern, easy dashboard' cannot be tested, so nobody can say when it is done.
  • One milestone for the whole project. You carry the full risk until the end, which defeats the point.
  • Hidden buffers. The vaguer the scope, the larger the allowance a sensible developer adds for safety, and you pay for it whether or not it is used.
  • Silence on third parties. If a bank or a software vendor is slow to issue API access, the contract should say whose problem that is.

If you are not sure your scope is tight enough, our guide to a software development proposal lists what each section of a good proposal should pin down.

How time and material billing works

Under time and material you buy capacity rather than an outcome. That is the right purchase when nobody can honestly say how long the work will take: a research spike, an integration with an undocumented system, or a product whose direction changes with each round of user feedback. It needs more supervision from you, so write these controls into the agreement:

  • A rate card in writing for every role who may bill, so a senior rate does not appear on routine tasks.
  • Weekly timesheets broken down by task, not a single total.
  • A not-to-exceed cap per month or per phase, after which work stops until you approve more.
  • A warning when a set share of the cap has been used, so you can decide before the limit, not after it.
  • Your right to reprioritise or stop at any time and keep everything already built.
  • One named person on your side who decides what is worked on next.

Time and material also suits long-running work after launch, such as a steady stream of small fixes. For costs after go-live, see software maintenance cost.

Change requests under each model

Every project changes. The contract model decides what a change costs you in paperwork and in money. First separate a defect from a change: a defect is when delivered work fails its written acceptance criteria and should be fixed at no charge; a change is anything new, different or larger than what was written.

What happens when you ask for something new
StepFixed priceTime and material
You raise the requestIn writing, against the current scopeUsually a new item on the backlog
The developer respondsA written estimate of extra cost and time, or a swap for something of similar sizeAn estimate of hours, if you ask for one
ApprovalYou sign the change before work startsOften implicit: if it is worked on, it is billed
Effect on the budgetKnown before you agreeKnown after the hours are logged
Effect on the dateStated in the change noteFollows from where you put it in the queue

A practical example: halfway through a fixed price build you decide warehouse staff need their own sign-in and screens. That new user role is a change. The developer replies with the added work and a revised date, or offers to drop a lower-priority report to keep the total the same. Under time and material it simply adds hours.

When fixed price or time and material fits better

Common situations and the model that usually suits them
SituationUsually better fitWhy
A marketing website or online store with a page listFixed priceThe deliverable is easy to describe and to check
An MVP with a written feature listFixed price per milestoneEach milestone can be tested before the next is paid
An AI feature where accuracy is unknown until testedTime and material for a trial, then fixed priceYou first need to learn whether the approach works
Integration with an old system nobody has documentedTime and material for discovery, then fixed priceThe unknowns sit in someone else's software
Steady small changes after launchMonthly retainer or time and materialThe work is a flow, not a project
An app inherited from another teamA fixed audit milestone firstNobody can price new work on code they have not read

The last row is common enough to have its own guide: how to take over an existing app. If you are deciding how to buy development at all, how to outsource app development covers the wider choice.

The hybrid most buyers end up with

Many projects mix the two. A sensible pattern is a short paid discovery to answer the open questions, then fixed prices for each delivery milestone, then a retainer or hourly arrangement for the steady work that follows launch. Discovery turns unknowns into a written scope; the fixed milestones protect the budget while the main build happens; the retainer keeps the software healthy without a new contract for every small change.

If your first release is still a wish list, work through the MVP scope guide before you ask anyone for a fixed price. A shorter list gets a tighter price.

How Codebrix prices a project

We quote builds as a fixed price per milestone. Send the requirement through the enquiry form and someone from the team rings you back within the hour, whatever the time or day, and talks through pricing on that call. A written proposal follows, with the fixed price split into milestones, and you pay each milestone as it is delivered.

  • A working demo every week on a staging link or a test build, so you can judge progress yourself.
  • Code, repositories, store accounts, cloud, domain and hosting held in your name.
  • 30 days of free bug fixes after launch.
  • An optional month-to-month support retainer afterwards, which you can end with 30 days' notice.
  • If you hire a developer to work inside your own repo, board and chat tools, that engagement starts with one paid milestone.

Frequently asked questions

Is fixed price cheaper than time and material?

Not automatically. A fixed price includes the developer's allowance for risk, so a vague scope produces a padded quote. Time and material charges only for hours worked, but there is no ceiling unless you set one. For a well-defined project, fixed price is usually the safer buy. For genuinely uncertain work, time and material with a monthly cap often wastes less money.

Can a fixed price software project still go over budget?

Yes, through changes you ask for. The fixed price covers the written scope only. Every new role, screen, integration or report added during the build is a change request with its own cost and date impact. Keep a running list of approved changes, and consider swapping a lower-priority feature out each time you add one, so the total stays where you planned it.

What is a not-to-exceed cap in a time and material contract?

It is a limit on how much can be billed in a period or phase without your fresh approval. Once hours reach the cap, work pauses until you decide whether to approve more. Ask for an early warning when a set share of the cap is used, and for weekly timesheets broken down by task, so the decision is yours and is made in good time.

How should change requests be handled in a fixed price contract?

In writing, before the work starts. You describe the change, the developer replies with the extra cost and the effect on the delivery date, and you sign or decline. Agree first how a defect differs from a change: a defect is delivered work that fails its written acceptance criteria and is fixed free; anything new or different is a change.

When is time and material the wrong choice?

When you cannot supervise it. Time and material needs someone on your side to set priorities each week, read timesheets and decide when to stop. If nobody has that time, hours drift and the budget grows without a clear finish. In that case, spend a small fixed amount on discovery to write down the scope, then move to fixed price milestones.

Does Codebrix work on a fixed price or hourly basis?

Builds are priced as a fixed amount per milestone, set out in a written proposal after a call in which pricing for your scope is discussed. You pay each milestone on delivery. After launch there are 30 days of free bug fixes, then an optional month-to-month support retainer you can end with 30 days' notice.

  • Buying guide

    The software development proposal: what it should contain and how to ask for one

    What a software development proposal should contain, a section-by-section template, how to write an RFP for agencies and how to compare the replies.

    Read more
  • Rescue guide

    How to take over an existing app from another developer

    How to take over an existing app from another agency or freelancer: the access checklist, the code audit, store transfers, and stabilising before new work.

    Read more
  • Outsourcing guide

    How to outsource app development and keep control of your app

    How to outsource app development and keep control: what stays in-house, the accounts to open first, engagement models, time zones, IP and the handover.

    Read more
  • Product guide

    How to scope an MVP that tests one assumption and nothing more

    How to scope an MVP: pick the one assumption to test, prioritise with MoSCoW, cut the rest, follow a sample build plan and track the right metrics.

    Read more
  • Outsourcing guide

    Outsourcing software development to India: a practical playbook for buyers

    Outsourcing software development to India from the US, UK, EU or Australia: engagement models, IP, payments, time zones, red flags and a 30-day plan.

    Read more
  • MVP development

    MVP development: a narrow first product, built to test one belief

    MVP development company that cuts scope first, then ships a web or mobile MVP with analytics in place. Fixed-price milestones, your code.

    Read more

Tell us what you need

Our team calls you within 1 hour with pricing.

What do you need? (tap any)
Or message us on WhatsApp

We call within 1 hour, any time. Privacy policy

Start a project