Skip to content

Cost guide

Website development costs: a breakdown by type of website

Website development costs depend first on the type of site: a landing page, a small business site, a larger marketing site with a CMS, an online store or a web application. Each type includes different work, has different cost drivers and takes a different time to build. This page compares the five and links to the detailed guide for each.

Payment
Fixed price, per milestone
Support
30 days of free fixes
You own
Repository, domain, hosting
Pricing
On a call within 1 hour

Updated · By the Codebrix team

Website development costs by type of website

Ask five agencies how much it costs to build a website and you get five answers, because each pictures a different kind of site. Before comparing prices, decide which of these five you are buying. The contents and cost drivers hold for any competent builder.

Five types of website: contents and cost drivers
Type of siteWhat it includesWhat drives its cost
Landing pageOne page built for a campaign: headline, proof, offer, form and conversion trackingCopy and design rounds, the number of variants to test, the form or CRM connection
Small business siteUp to six pages, such as home, about, services and contact, with basic SEO and analyticsHow custom the design is, and whether copy and photos are ready
Larger marketing site with a CMSAround fifteen pages, a blog or resources section, lead forms, editable content, technical SEO and schemaNumber of page templates, CMS roles, redirects from an old site, languages
Online storeCatalogue, cart, checkout, payments, shipping rules, order emails and policy pagesCatalogue size and variants, theme or custom design, migration, apps and integrations
Web application or portalSign-in, user roles, a database, business rules, an admin panel and integrationsRoles, screens, integrations, data migration, reporting, compliance

Effort does not rise smoothly from one row to the next. It steps up at four points, described below.

Where the cost steps up from one type to the next

From a landing page to a small site

A landing page has one job and one template. A small site has several templates, navigation, and pages that must agree with each other in tone and design. The extra cost is design and content, not engineering. If you only need to test an offer with paid traffic, a landing page is the smaller purchase.

From a small site to a CMS site

Once your team wants to publish without a developer, the site needs a content management system, editor roles, previews and templates flexible enough for pages nobody has planned yet. A site that replaces an older one also brings redirects and content to move.

From content to commerce

A store adds money: products, stock, tax, shipping, payment and refunds, each of which must be right on every order. Platform choice matters here. On a hosted platform such as Shopify much of this is configured, not built, and platform and payment fees join the running cost; our Shopify store cost guide lists them.

From a website to an application

When visitors sign in and see their own data, you are commissioning software. Roles, permissions, a database and testing take over as the main costs, and page count stops meaning much. The web application development cost guide covers that budget, and web app vs website helps you tell which side of the line you are on.

Website cost breakdown: the stages of work behind a price

Whatever the type, a quote is the sum of the same stages of work. What changes from type to type is how heavy each stage is.

Stages of work and where each weighs most
StageWhat happensHeaviest for
ScopeGoals, sitemap, page templates and a written list of what is includedWeb applications and stores
DesignLayouts for each template on phone and desktop, approved before the buildMarketing sites and landing pages
ContentCopy, photos, product data and translations, written or gatheredLarger sites and stores
Front-end buildTemplates coded to be responsive, fast and accessibleEvery type
CMS or platform setupEditing tools, or the store platform's catalogue, tax and shipping settingsCMS sites and stores
Back end and integrationsDatabase, business rules, and CRM, payment or booking connectionsWeb applications
TestingDevices, forms, payments, permissions and speedStores and web applications
LaunchDomain, redirects, analytics, Search Console and handoverSites replacing an older one

We have left percentages out on purpose. A split that is true for one project is wrong for the next. Ask each bidder to price these stages as milestones instead, so you can see where their number comes from. Our website brief template gives you the document to send them.

How website development costs differ by market

The amount of work in a given scope does not change with the client's country. The list of requirements does, and so do the bills that follow launch. Codebrix works from one office in Noida with clients in India and abroad, and these are the differences we scope for most often.

What changes by market, and the guide for each
MarketWhat changes the scopeDetailed guide
IndiaIndian payment gateways and UPI, quotes stated with or without GST, content in more than one languageWebsite development cost in India
USAAccessibility work to WCAG, privacy opt-out tooling, US hostingWebsite development cost in the USA
Dubai and the UAEAn Arabic right-to-left version, a .ae domain, VATWebsite development cost in Dubai

Which laws apply to your site in any of these markets is a question for your legal adviser; we build to the requirements you bring. Each guide above goes through its market's line items in detail.

Costs that continue after the site is live

  • Domain: renewed each year with your registrar.
  • Hosting: for sites built in Next.js, Vercel lists a free Hobby plan and a Pro plan at $20 a month per developer seat, as of November 2026.
  • CMS or store platform: a subscription if you are on a paid plan, plus apps on a store.
  • Payment fees: charged per order by the gateway, on stores and any site that takes payment.
  • Maintenance: updates, fixes and small changes. Our retainer is optional and runs month to month with 30 days' notice; see website maintenance cost.
  • The next rebuild: reusing content and structure lowers that bill when it comes; see website redesign cost.

Cost guides for specific kinds of project

This page is the overview. Each guide below takes one kind of project and goes through its drivers, recurring bills and hidden costs.

Which cost guide to read next
If you are budgeting forRead
An online store in IndiaE-commerce website cost in India
A Shopify storeShopify store setup cost in India
A portal, dashboard or internal toolWeb application development cost
Rebuilding an existing siteWebsite redesign cost
Keeping a site updated and secureWebsite maintenance cost
A subscription software productSaaS development cost

How to get a price for your website

  1. Pick the type from the first table. If you sit between two, say so.
  2. List your page templates, not only a page count.
  3. State what is ready: copy, photos, product data, brand.
  4. Name every system the site must connect to.
  5. Give your deadline and the reason for it.

Put those five points in our enquiry form. The team telephones within the hour, round the clock and through the weekend, talks the requirement through and gives you the price on that call. You then receive a written proposal with a fixed price and milestones, and pay per milestone. The repository, domain and hosting are in your name, and bug fixes are free for 30 days after launch. For how we build, see web development and web app development; to talk now, message us on WhatsApp.

Frequently asked questions

How much does it cost to build a website?

It depends on the type of site and its scope. A landing page, a six-page business site, a fifteen-page site with a CMS, an online store and a web application are five different amounts of work. Codebrix does not publish prices: send your requirement through the enquiry form, the team calls within an hour at any time, shares pricing on the call and follows with a written fixed-price proposal.

What is included in website development costs?

A full quote covers scope, design, content handling, the front-end build, CMS or store platform setup, any back end and integrations, testing and launch, including redirects and analytics. Domain, hosting, platform subscriptions, payment fees and maintenance are recurring and usually billed separately by those providers. Ask every bidder to list what is included and what is excluded before comparing totals.

Which type of website costs the most to build?

A web application or portal, as a rule, because it needs sign-in, user roles, a database, business rules, an admin panel and much more testing than a content site. It also takes longest to build. An online store sits between the two, depending on catalogue size and integrations.

How long does it take to build a website?

A simple business website of up to six pages usually goes live in 7–10 days once the copy and photos are ready. Larger sites with a CMS, online stores and web applications are scheduled in the written proposal after the call, milestone by milestone, because page templates, integrations, data to move and approvals decide the schedule. Ready copy, photos and a single decision maker keep any project moving.

Does website development cost differ by country?

Yes, in two ways. Requirements differ by market: a site for US customers may need accessibility work to WCAG and privacy opt-out tooling, one for the UAE an Arabic right-to-left version and a .ae domain, and an Indian site local payment gateways and UPI. Suppliers in different countries also charge different rates, so compare quotes against the same written scope.

What are the ongoing costs after a website is built?

A domain renewal each year, hosting, any paid CMS or store platform plan, payment gateway fees if you sell online, third-party tools such as booking or email marketing, and optional maintenance. As of November 2026, Vercel lists a free Hobby plan and a Pro plan at $20 a month per developer seat for hosting. Keep every account in your business's name so the bills come straight to you.

Sources

  • Cost guide

    How much does website development cost in India?

    Website development costs in India, explained: what moves the price, one-time vs recurring bills, hidden costs and how to get pricing for your scope.

    Read more
  • US cost guide

    What website development costs for a US business, line by line

    Website development cost in the USA: what drives the price, plus US line items like WCAG accessibility, CCPA opt-out tooling and US hosting, explained.

    Read more
  • Cost guide

    Website development cost in Dubai: what drives the price

    Website development cost in Dubai: what drives the price, what an Arabic version adds, .ae domain rules, hosting, VAT basics and how to get an AED price.

    Read more
  • Cost guide

    Web application development cost: what you pay for and why

    Web application development cost explained: the six cost drivers, what a build includes, one-time vs recurring bills, hidden costs and how to get a quote.

    Read more
  • Cost guide

    How much an ecommerce website costs to build and run in India

    Ecommerce website development cost in India: Shopify, WooCommerce or custom compared, what drives the build price, payment fees worked out, hidden costs.

    Read more
  • Cost guide

    What website maintenance costs each month, and what it should cover

    Website maintenance cost per month, split into running bills and care: verified hosting and certificate prices, what drives care cost and what is in scope.

    Read more

Tell us what you need

Our team calls you within 1 hour with pricing.

What do you need? (tap any)
Or message us on WhatsApp

We call within 1 hour, any time. Privacy policy

Start a project