Manufacturing
Manufacturing ERP development for BOMs, production, stores, quality and dispatch
Manufacturing ERP development means building one system that links your bills of material, production plans, shop-floor work orders, raw material and finished goods stock, quality checks and dispatch, so the factory, stores and accounts work from the same numbers. We build it for Indian manufacturers in phases, connect it to the accounting software you keep, and start where material or time leaks most.
- Core
- BOM, planning, stores, QC, dispatch
- Shop floor
- Tablets and phones
- Accounts
- Stays in your package
- Pricing
- Explained on a call within the hour
Updated · By the Codebrix team
What makes a factory ERP different
Our ERP development service covers the general shape of an ERP build: which module owns what, the hand-off to accounts and GST e-invoicing. A factory adds problems a trader never meets. Material changes form, as steel becomes brackets and brackets become assemblies. Stock exists in states: raw, issued, in process, rejected, finished. Some of it leaves the building for job work and comes back. And the true cost of a product is only known once the batch is done.
| Question | Trading business | Manufacturer |
|---|---|---|
| What is an item? | Something bought and sold | Raw material, sub-assembly, finished good, scrap or by-product |
| Where is stock? | In a warehouse | In stores, on the line, at a job worker, in quarantine or ready to ship |
| What drives purchase? | Sales and reorder levels | The production plan exploded through the BOM |
| What is cost? | Purchase price plus freight | Material, labour, machine time, overheads and scrap per batch |
Modules of a manufacturing ERP
| Module | What it covers |
|---|---|
| Bills of material | Multi-level BOMs, versions with effective dates, alternate materials, expected scrap per stage |
| Production planning | Orders and forecasts turned into work orders; material needs netted against stock and open purchase orders |
| Shop floor | Job cards per operation, machine and shift; material issue and return; output and rejection entry |
| Stores | Raw, WIP and finished stock by location, batch or lot numbers, FIFO issue, physical counts |
| Purchase | Indents from planning, approvals, purchase orders, goods receipt pending inspection |
| Quality | Incoming, in-process and final inspection plans, results, non-conformance and rework |
| Job work | Material sent out, challans, receipts back, balance held by each job worker |
| Dispatch | Packing, invoices, e-invoice and e-way bill details, delivery tracking |
| Costing | Standard against actual cost per batch, variance by material, labour and scrap |
Barcode scanning and warehouse layouts are covered on our inventory management software page. Price depends on plants and product complexity, the modules in phase one, shop-floor devices, integrations with accounts and the GST systems, and how clean your item master and BOMs are today. List your plants, products and first-phase modules in the enquiry form. Our team calls within the hour, weekends and late evenings included, to understand the requirement and share pricing; the agreed scope then becomes a fixed-price proposal paid per milestone.
BOMs and production planning done properly
Most factory ERP problems trace back to a BOM nobody trusts. If the BOM says 2.0 kg of material per unit and the line actually uses 2.3 kg, every purchase plan and cost report is wrong by the same 15 per cent.
- BOM versions with effective dates, so an engineering change does not rewrite history for batches already made.
- Expected scrap at each stage, compared every week with actual rejection entries.
- Planning that explodes confirmed orders through the BOM, nets off stock and open orders, and proposes indents and work orders for a planner to approve.
- Capacity checks on bottleneck machines and shifts only, rather than a full scheduling engine on day one.
- Make-to-order and make-to-stock side by side, with material reserved against specific orders.
Indian rules that shape a factory ERP
Three sets of rules regularly change how we design manufacturing ERPs. These are facts as of November 2026; your CA confirms how they apply to you.
E-way bills for dispatch and job work
The e-way bill system covers movement of goods worth more than ₹50,000. Its FAQ adds that goods sent for job work under specified circumstances need an e-way bill even below that value, so the job work module prepares e-way bill details along with the challan. One e-way bill is generated per invoice; several can then be combined into a consolidated e-way bill when they travel in one vehicle. Since 1 January 2025 the system accepts only documents dated within the previous 180 days (advisory), so old challans have to be cleared, not left pending.
E-invoicing
Notification 10/2023–Central Tax replaced ten crore rupees with five crore rupees as the e-invoicing turnover threshold from 1 August 2023 (GST Council copy). The dispatch module treats a B2B invoice as final only once the invoice reference comes back; the ERP service page describes that flow.
Paying MSME suppliers on time
Many factory suppliers are micro or small enterprises. The DC-MSME office summarises the MSMED Act, 2006 rule this way: a buyer that does not pay for supplies within 45 days of accepting them owes the supplier compound interest with monthly rests at three times the bank rate notified by the RBI (DC-MSME note). The ERP records each supplier's MSME status, calculates due dates from the acceptance date on the goods receipt, and shows payments approaching 45 days on an ageing report.
Quality and traceability
- Inspection plans per item: what to check, sample size and limits, set by your quality team.
- Goods received go to a quarantine location until incoming inspection passes.
- Rejections recorded with a reason code, so the scrap report says why, not just how much.
- Batch or lot numbers carried from raw material through work orders to dispatch, so a customer complaint traces back to the supplier lot quickly.
- Non-conformance reports with corrective actions, owners and due dates.
Rollout plan for a running factory
- Walk the floor: follow one order from purchase to dispatch and collect every register, job card and challan.
- Clean the item master and BOMs before anything else; it is usually the longest step and depends mostly on your team's knowledge.
- Phase one, usually stores, purchase and BOM-based material issue, built in weekly sprints with a staging demo each week.
- A physical stock count on cut-over day, entered as opening balances by location and batch.
- A parallel run through one month-end, reconciling stock and consumption against the old method.
- Phase two adds production planning, shop floor and quality; phase three adds costing, job work and dispatch integration.
- Shop-floor screens tested on tablets or phones with supervisors on the line, not only in the office.
Repetitive steps around the ERP, such as purchase approvals or supplier reminders, can be automated as well; see business automation.
What goes wrong in factory ERPs
| Problem | How we prevent it |
|---|---|
| ERP stock never matches the store | Issues only against work orders, and weekly cycle counts on fast-moving items |
| Job cards filled from memory at shift end | Entry at the machine on a tablet, with counts from the machine where it can provide them |
| Planners ignore the plan because it is always wrong | Correct BOMs and lead times first; plan the bottleneck only |
| Material at job workers goes missing | A running balance per job worker, reconciled challan by challan every month |
| Costing arrives too late to act on | Batch cost visible as soon as the batch closes |
Frequently asked questions
Which company can build an ERP for my manufacturing business?
Look for a team that starts by walking your floor and cleaning your BOMs, phases the build, and integrates with your existing accounts instead of replacing everything at once. We build manufacturing ERPs from Noida for factories across India, working remotely with visits where the process needs them, and you own the code and database from day one.
Custom manufacturing ERP or an off-the-shelf one?
Off-the-shelf works when your production already matches the package's routings and reports. Custom pays off when your routings, job work, quality checks or costing are what set you apart, or when several plants need one live view. Many factories keep packaged accounting and build custom production and stores around it.
How much does manufacturing ERP development cost?
Plants, product and BOM complexity, phase-one modules, shop-floor devices, integrations with accounts, e-invoice and e-way bill systems, and the state of your current data decide it. A stores and purchase first phase is much smaller than a full ERP. You hear the price by phone within an hour of enquiring, at any time of day, and each phase then gets its own fixed-price proposal.
Can the ERP generate e-invoices and e-way bills?
Yes. Invoices go to the e-invoice system for a reference before they are final, and e-way bill details are prepared from the invoice or job work challan, through a GST Suvidha Provider, a bulk file or the direct API where you qualify. Your CA confirms which rules apply to your turnover and movements.
Can we keep using our accounting software?
Usually, yes. The ERP posts purchase, sales, stock and production entries to the accounting package your CA already files from, using that package's import or integration options, with a reconciliation report each day. We confirm what your version supports during discovery, before anything is built.
Can supervisors use it on the shop floor?
Yes. Shop-floor screens are built for tablets and phones: large buttons, a handful of fields per job card, Hindi labels where needed, and offline entry that syncs when Wi-Fi returns. We test them with supervisors on the line during design, because screens that work in an office often fail next to a machine.
Sources
Related
ERP development
ERP software development, rolled out one module at a time
ERP software development company in India: inventory, purchase, sales, HR and accounts hand-off built in phases, with GST e-invoicing where needed.
Read moreCost guide
ERP development cost in India, and how phasing keeps it in check
ERP software development cost in India: modules, branches, GST and Tally links, data cut-over, and how a phased rollout keeps spend under control.
Read moreInventory software
Custom inventory management software, built so the screen matches the shelf
Inventory management software development: multi-location stock, barcode scanning, batch and expiry tracking, reorder alerts, store and POS sync.
Read moreLogistics
Logistics software development for transport management, fleet tracking and delivery
Logistics software development: transport management, GPS fleet tracking, driver apps with proof of delivery and e-way bill integration for Indian fleets.
Read moreBusiness automation
Business automation for small and mid-sized companies, with or without AI
Business automation services in India for SMBs: approvals, invoices, reports and data sync on Zapier, Make, n8n or code, with AI only where it helps.
Read moreCustom software
A custom software development company that helps you decide before you build
Custom software development company in India for internal tools, portals, integrations and apps. Build-vs-buy advice first, fixed milestones, code you own.
Read more